Resilient Building Council

Projects with useful records.

Historic work anchors the portfolio. New case studies can add drawings, decisions, and lessons.

Finished room with timber and natural wall materials
Historic project photograph.
Earthen Heart massage studio project

Adaptive reuse

Earthen Heart massage studio

A 300-square-foot storage room converted into a least-toxic massage studio.

Chemical-sensitivity guidelinesOwner-hosted plaster work partyFSC-certified or salvaged woodReed mat plaster substrateReduced electric and magnetic fieldsEarthen plaster and paint
Garden-Raised Bounty farmhouse project

Community building

Garden-Raised Bounty farmhouse

A community-supported education center, program office, and headquarters for a nonprofit organization.

Radiant slab-on-gradeFaswall wall systemLime stucco and site-clay plasterAdvanced framing and airtight drywallGreywater and rainwater readyReclaimed and donated wood
Dan Kelly home and office project

Owner-built home

Dan Kelly home and office

A 2,400-square-foot, two-bedroom Durisol home and office.

First permitted Durisol home in the South SoundOwner-builder general contractorRecycled woodchip concrete formsExterior lime stuccoInterior earthen plasterSalvaged materials
Dawson-Moore home project

Urban infill

Dawson-Moore home

An 800-square-foot accessory dwelling and an early permitted urban straw bale home in the region.

Owner-builder general contractorBale raising and plaster workshopPost-and-beam structureStraw bale and Icynene insulationEarth and lime plastersPassive solar design
Kraft farmhouse project

Owner-builder support

Kraft farmhouse

A 900-square-foot farmhouse completed with owner-builder facilitation.

High-insulation envelopeRecycled denim and rigid insulationLocal clay, sand, and fiber plasterReed lath substrateBotanical oilsMilk-paint finishes

Case study format

What to document next.

A useful case study explains the choice, not only the finished room.

Project drawings

Plans, wall sections, window details, and marked-up construction sets from completed work.

Short site films

Two-minute explanations of a wall, material, failure, repair, or community build process.

Material studies

Side-by-side samples with notes on sourcing, installation, drying, repair, cost, and maintenance.

Decision records

Brief case notes that show the options, constraints, chosen detail, and what the team learned.

Have a project the council should study?

Share photographs, drawings, the core decision, and what changed during construction.

Share a project